Integrated Cost and Schedule Control for Construction Projects

€ 74,00
+ € 6,49 Verzending

Integrated Cost and Schedule Control for Construction Projects

  • Merk: Unbranded

Integrated Cost and Schedule Control for Construction Projects

  • Merk: Unbranded
Prijs: € 74,00
Verkocht door:
€ 74,00
+ € 6,49 Verzending

Op voorraad

We accepteren de volgende betalingsmethoden

Beschrijving

I Preparing a Project for Construction. - 1. Work Environments within the Construction Industry. - 2. Common Descriptions of Work. - 3. The Project Statement of Expectations. - 4. Single Data Capture and Integrated Systems. - 5. Management Information Systems. - 6. Computer Applications. - 7. Project Statement of Expectations and Performance Models. - 8. Estimates and Budgets as Performance Models. - 9. The Schedule as a Performance Model. - 10. The Cost Curve and the Production Curve as Performance Models. - 11. The Planned Schedule of Values and Cash Income Curves as Performance Models. - 12. The Planned Cash Requirements Curve as a Performance Model. - 13. Production Forecasting and Analysis and Cash Analysis. - II Administrative Project Activity Flow. - 14. Prebid Activities. - 15. Preconstruction Activities. - 16. The Construction Phase of the Project. - 17. Job Closeout. - 18. Contract Administration. - 19. Cash Management Information and Strategies. - III Construction and Production. - 20. The Construction Team and Its Working Relationships. - 21. Administrative Prerequisites to Starting Construction. - 22. The Game Plan and Making It Work. - 23. Production Management. - 24. The Turnaround Document and Its Use. - 25. Performance Measurements. - IV Project Monitoring and Control. - 26. Schedule Update and Control. - 27. Projections to Completion. - 28. Update of Production Projections. - 29. Exception Reporting. - 30. Cost Control. - 31. The Schedule and Other Informational Procedures. - Appendix A. Preconstruction Job Planning. - Appendix B. Summary Levels of Detail for Project Informational Processes. - Appendix C. Cost Types and Their Uses. - Appendix D. Performance Ratio Comparisons. Language: English
  • Merk: Unbranded
  • Categorie: Referentie
  • Artiest: Frederick W. Mueller
  • Uitgever / Label: Springer
  • Formaat: Paperback
  • Aantal pagina's: 506
  • Verschijningsdatum: 2012/02/02
  • Taal: English
  • Fruugo-ID: 343654627-752835559
  • ISBN: 9781461597520

Levering & retouren

Verzonden binnen4 dagen

  • STANDARD: € 6,49 - Levering tussen do 09 oktober 2025–di 14 oktober 2025

Verzending vanaf Verenigd Koninkrijk.

We doen ons best om ervoor te zorgen dat de producten die u bestelt volledig en volgens uw specificaties bij u worden afgeleverd. Mocht u echter een onvolledige bestelling ontvangen of andere artikelen dan degene die u heeft besteld, of als er een andere reden is waarom u niet tevreden bent met de bestelling, dan kunt u de bestelling retourneren, of welk product dan ook die bij de bestelling was inbegrepen, en ontvangt u een volledige terugbetaling voor de artikelen. Bekijk het volledige retourbeleid